The Zed Shed Part Deux Build still going


Keyser

Recommended Posts

Well looks like Phase 3 is nearing completion :thumbs:

 

From this -

 

S1051049_zps9ivle2tq.jpg

 

to this

 

S1051063_zpsgiaqqfc7.jpg

 

and from the front -

 

this

 

S1051055_zpszpvgcup6.jpg

 

 

to

 

S1051064_zpstlkwlqmz.jpg

 

 

 

Along the way we started to clear the decking

 

S1051058_zpsxmlphlrk.jpg

 

Built a new wall

 

S1051057_zps1a7lbkqe.jpg

 

We do have some rubble to clear :scare:

 

S1051061_zpscrscuw0l.jpg

 

Not that the builders will be much help

 

S1051060_zpsfcsoraak.jpg

 

Phase 4 soon - the big dig :thumbs:

  • Like 1
Link to comment
Share on other sites

Well looks like Phase 3 is nearing completion :thumbs:

 

From this -

 

S1051049_zps9ivle2tq.jpg

 

to this

 

S1051063_zpsgiaqqfc7.jpg

 

and from the front -

 

this

 

S1051055_zpszpvgcup6.jpg

 

 

to

 

S1051064_zpstlkwlqmz.jpg

 

 

 

Along the way we started to clear the decking

 

S1051058_zpsxmlphlrk.jpg

 

Built a new wall

 

S1051057_zps1a7lbkqe.jpg

 

We do have some rubble to clear :scare:

 

S1051061_zpscrscuw0l.jpg

 

Not that the builders will be much help

 

S1051060_zpsfcsoraak.jpg

 

Phase 4 soon - the big dig :thumbs:

I have to say I have no knowledge of the building industry but after close scrutiny of the recent photos that chap in the blue caravan wearing glasses is definitely poring over the plans!

Apparently there is is a skills shortage so I think you guys are in safe hands............

 

  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...

Despite the rather wet Friday we have been getting on with the garden,

 

Few roots out first

 

S1051068_zpszwid9cjt.jpg

 

S1051067_zps50eojavr.jpg

 

 

Then I persuaded the shed it should be in the next door neighbors garden :lol:

 

S1051071_zpsyn3jeb7x.jpg

 

I persuaded it with this :thumbs:

 

S1051070_zpsmxrdh0zk.jpg

 

It used to look like this

 

image2_zpseweqvznq.jpg

 

the other side of the garden looked like

 

 

image1_zpsqlesgolz.jpg

 

i flat packed the "camo" shed

 

S1051069_zpshnxx85r9.jpg

 

then we cleared the site

 

S1051073_zpsiof6ehf1.jpg

 

S1051074_zps053ywpqw.jpg

 

More soon :)

  • Like 5
Link to comment
Share on other sites

Evening all, Time for an update :)

 

Phase 1 - New Kitchen - Complete (Wife Happy)

 

Phase 2 - New Utility Room - Complete (Wife very happy)

 

Phase 3 - Remove old attached garage/Utility room, move boiler etc - Complete - well except a bit of render and the toilet needs a new sink) :lol:

 

Onto Phase 4 the more interesting bit and we get to play with big boys toys :thumbs:

 

The boys started on Monday, we (Mrs K and myself) had already cleared the site

 

S1051081_zpsxt5ldgtt.jpg

 

In a day we had 6 x 20 Ton trucks loaded and gone - awesome work :)

 

All dug down up to the old camo shed base which was previously a subterranean green house

 

S1051082_zpsx1vckhvh.jpg

 

Today Andy and I came across something that surprised us slightly well a lot to be honest,

It was more a bunker than a green house - check out the amount of concrete we found :scare:

 

S1051087_zpskelklon3.jpg

 

S1051083_zps0onesjwx.jpg

 

S1051084_zpsqndlldbn.jpg

 

S1051086_zpswd2fja6q.jpg

 

S1051087_zpskelklon3.jpg

 

S1051088_zpsxu7pwrtv.jpg

 

S1051085_zpsphfqnsbk.jpg

 

Mad or what :wacko:

 

The solution was ..........................

 

 

 

 

DIGGER WARS :teeth:

 

 

 

 

IMG_0444_zps3uslyhgf.jpg

 

IMG_0443_zpsqrcftrzl.jpg

 

IMG_0441_zpseezkoyly.jpg

 

First 20 Ton load of concrete should be collected tomorrow morning - then we will dig out another load :lol:

 

More coming soon :thumbs:

Edited by Keyser
  • Like 3
Link to comment
Share on other sites

Evening all, Time for an update :)

 

Phase 1 - New Kitchen - Complete (Wife Happy)

 

Phase 2 - New Utility Room - Complete (Wife very happy)

 

Phase 3 - Remove old attached garage/Utility room, move boiler etc - Complete - well except a bit of render and the toilet needs a new sink) :lol:

 

Onto Phase 4 the more interesting bit and we get to play with big boys toys :thumbs:

 

The boys started on Monday, we (Mrs K and myself) had already cleared the site

 

S1051081_zpsxt5ldgtt.jpg

 

In a day we had 6 x 20 Ton trucks loaded and gone - awesome work :)

 

All dug down up to the old camo shed base which was previously a subterranean green house

 

S1051082_zpsx1vckhvh.jpg

 

Today Andy and I came across something that surprised us slightly well a lot to be honest,

It was more a bunker than a green house - check out the amount of concrete we found :scare:

 

S1051087_zpskelklon3.jpg

 

S1051083_zps0onesjwx.jpg

 

S1051084_zpsqndlldbn.jpg

 

S1051086_zpswd2fja6q.jpg

 

S1051087_zpskelklon3.jpg

 

S1051088_zpsxu7pwrtv.jpg

 

S1051085_zpsphfqnsbk.jpg

 

Mad or what :wacko:

 

The solution was ..........................

 

 

 

 

DIGGER WARS :teeth:

 

 

 

 

IMG_0444_zps3uslyhgf.jpg

 

IMG_0443_zpsqrcftrzl.jpg

 

IMG_0441_zpseezkoyly.jpg

 

First 20 Ton load of concrete should be collected tomorrow morning - then we will did another load :lol:

 

More coming soon :thumbs:

We have been up against it today as removing an underground nuclear bunker was not part of the site clearance budget!

But as you can see with proactive organisation,the correct tools and some bloody minded determination we won!

Makes you wonder what kind of person wants and builds a greenhouse like that! Eeeek!

  • Like 3
Link to comment
Share on other sites

Epic days progress today,

 

I took a day of work and alongside Andy James we broke the back of the site prep :thumbs:

 

first load out -

 

S1051089_zpsiwy1b5lh.jpg

 

This guy can shift some big slabs :thumbs:

 

S1051090_zpsdbc4f8mn.jpg

 

our grab driver was Ellliot and hats of he goes the extra mile, nothing was to much trouble he knows his machine and how to use it and even cleared/built a dumping ramp each time he took a load out, hats of to the man.

 

More soil out

 

S1051094_zpsbwaztudy.jpg

 

 

The totals were

 

12 x 20 ton trucks each carries approx 16 tons so 192 Tons of soil

 

2 x 20 ton and 1 10 ton truck load of concrete so - 42 tons of concrete blocks and rubble

 

a grand total of 234 tons :scare:

 

 

Moving on Andy had to say goodbye to his little pecker today

 

S1051091_zpsllj390is.jpg

 

:lol:

 

It was worked hard yesterday though!

 

 

So at the end of the day we have -

 

S1051095_zpsykaj0hx3.jpg

 

S1051093_zps9bzn4z7u.jpg

 

S1051092_zpso9mh0uaz.jpg

 

Even did a bit of pegging out

 

 

S1051097_zps64g4uwg5.jpg

 

S1051096_zpsgafewkfo.jpg

 

 

Proper mark out and start digging the footings tomorrow :yahoo:

 

 

More Soon.

  • Like 2
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...